Decision Atlas
NETNetwork designStop 1 of 11
  1. What network design decides
  2. Six distribution network designs
  3. Facility location models
  4. Greenfield studies
  5. Manufacturing footprint & plant roles
  6. Channel design & omnichannel
  7. Cross-docking vs stocking
  8. Postponement in the network
  9. Reverse logistics networks
  10. Carbon-aware network design
  11. Scenario modeling & digital twins

What network design decides

Facility roles, locations, capacities and who serves whom, and why the number of facilities trades cost against speed.

3 min gist, 10 min in full Draft, review pending

Read atChange any time

Four long-term decisions, and the one dial that trades cost against service.

Network design sets the physical skeleton of a supply chain: plants, warehouses and the lanes between them. These are long-term, expensive decisions. A warehouse lease or a new plant locks a company in for years, and it decides most of what transport and inventory will cost afterwards.

It comes down to four decisions:

  1. Facility role: what each site is for. Is a plant a low-cost producer, the hub for a region, or the lead site for new products?
  2. Location: where plants and warehouses should be.
  3. Capacity: how big each one should be.
  4. Market allocation: which plant supplies which warehouse, and which warehouse serves which customers.

Most of the trade-offs move with one dial: the number of facilities. Add warehouses and:

  • delivery gets faster and last-mile freight falls, because you’re closer to customers;
  • inventory rises, because each site needs its own safety stock (risk pooling works in reverse);
  • facility costs rise, with more rent, staff and systems;
  • inbound freight rises, because each site gets smaller, less efficient shipments.

So total logistics cost forms a U-shape: it falls at first, bottoms out, then climbs. A company competing on price sits near the bottom of the U with a few large warehouses. One competing on speed, such as same-day e-commerce or critical spare parts, deliberately builds past the cheapest point and pays for responsiveness.

Words to use

Market allocation
Which facility serves which demand region or customer.
Total logistics cost
Inventory + transport + facility and handling costs; U-shaped in the number of facilities.
Responsiveness vs efficiency
The core trade-off: faster service usually costs more.

The U-shaped cost curve in numbers, why each cost moves the way it does, and how a network study is run.

Why each cost moves

  • Inventory grows with the square root of the number of stocking points, the risk-pooling law in reverse.
  • Facility cost grows roughly in line with the number of sites: rent, staff, systems.
  • Outbound transport falls as sites get closer to customers. For customers spread over an area, the average distance to the nearest site shrinks roughly with 1/N1/\sqrt{N}.
  • Inbound transport rises slowly, because each site receives smaller, less efficient shipments.
Worked example: a stylized network

Annual costs in ₹ crore, following those shapes: inventory 4N4\sqrt{N}, facilities 1.5N1.5N, outbound 30/N30/\sqrt{N} and inbound 2+0.5N2 + 0.5N.

WarehousesInventoryFacilitiesOutboundInboundTotal
14.01.530.02.538.0
25.73.021.23.032.9
36.94.517.33.532.2
48.06.015.04.033.0
69.89.012.25.036.0
811.312.010.66.039.9

The total bottoms out at 3 warehouses, but the curve is flat between 2 and 4: the choice there can be made on service, risk or flexibility at little cost.

How a network study runs

  1. Frame the question: what may change (sites, capacities, flows) and what is fixed.
  2. Collect data: demand by location, freight rates by lane and mode, warehouse costs, inventory costs, service targets.
  3. Build and validate a baseline: model today’s network and check it reproduces actual costs and flows closely. If it can’t, nothing it says about the future can be trusted.
  4. Optimize and run scenarios: alternative designs, demand futures and cost shocks.
  5. Recommend: a design, its cost and service, the risks, and a transition plan.

Fitting the network to the strategy, how GST reshaped Indian networks, building in flexibility, and the classic modelling mistakes.

The network follows the strategy

A network can’t be cheapest and fastest at once. Fisher’s distinction between efficient and responsive supply chains applies directly: functional products with steady demand and thin margins want few, large, efficient sites; innovative or urgent products want more sites, closer to customers, and more stock. Many companies need both, so they segment the network: a lean backbone for the bulk, plus fast nodes for the products and customers that pay for speed.

How tax rules shaped networks in India

Before the Goods and Services Tax (GST) in 2017, inter-state sales attracted central sales tax, so companies often kept a warehouse in many states for tax reasons rather than logistics reasons. GST removed most of that incentive, and many firms consolidated into fewer, larger regional hubs placed for transport cost and service. It is a clear example of how a policy change can shift the bottom of the U-curve.

Building in flexibility

Network decisions last years, while demand and costs change faster. Ways to keep options open:

  • Lease rather than buy, or use third-party logistics (3PL) warehouses for uncertain regions.
  • Build in stages: modular capacity, with land or contract options for expansion.
  • Design for scenarios, not one forecast, and prefer designs that stay good across them.
  • Review regularly: every few years, or on triggers such as an acquisition, a new channel or a big shift in freight costs.

Classic modelling mistakes

  • Designing for today’s demand instead of the demand the network will serve for its lifetime.
  • Using averages: a network that works on average can fail at the festive peak. Check peak-week capacity.
  • Straight-line distances: real roads are longer, and some lanes are much slower than distance suggests.
  • Cost only: leaving out service, risk and carbon, then discovering the “optimal” network can’t meet delivery promises.
  • Ignoring the transition: closing sites costs money (leases, severance, dual running), so the move matters as much as the destination.

Interview kit

Practise it out loud

Answer each question yourself before opening the model answer.

Say it in 30 seconds

Network design makes four long-term decisions: facility roles, locations, capacities, and which facility serves which market. Most costs move with the number of facilities: more sites cut response time and outbound freight but raise inventory, facility and inbound costs, so total logistics cost is U-shaped. A cost-focused company sits near the bottom of that U; a speed-focused one deliberately builds past it.

What happens to inventory, transport and facility costs as you add warehouses?

Inventory rises because safety stock is split across more sites. Facility costs rise with more buildings. Outbound transport falls because customers are closer, but inbound transport rises because shipments to each site get smaller. Total cost is U-shaped, with a minimum somewhere in the middle.

Why might a company choose more warehouses than the cost-minimizing number?

Because its customers pay for speed. Same-day delivery promises or critical spare parts justify the extra inventory and facility cost; being slower would lose more revenue than the network saves.

Connected stops

Where this idea feeds in, or gets its inputs from.

Sources and further reading

  1. Chopra, S. & Meindl, P. Supply Chain Management: Strategy, Planning, and Operation. Pearson. Chapters on designing distribution networks and network design.
  2. Ferdows, K. (1997). Making the most of foreign factories. Harvard Business Review, 75(2), 73–88.
  3. Fisher, M. L. (1997). What is the right supply chain for your product? Harvard Business Review, 75(2), 105–116.
  4. Simchi-Levi, D., Kaminsky, P., & Simchi-Levi, E. (2008). Designing and Managing the Supply Chain (3rd ed.). McGraw-Hill.

Reading settings

Saved on this device. Changes apply as you choose them.

Theme
Text size
Typeface for reading
Line spacing
Line length
Start each topic at

Deeper levels stay one click away whichever you choose.

Preview

Safety stock covers the surprises while you wait for a delivery. It grows with the square root of lead time, not with lead time itself.

Lines

↑ ↓ move ↵ open Topics marked “Soon” open their line