Greenfield studies
Designing a network from a blank map, step by step, and how that differs from redesigning the one you already have.
Read atChange any time
A greenfield study designs the network as if nothing existed yet: no plants or warehouses you must keep. A brownfield study starts from today’s network and asks what to keep, close, move or add. Greenfield answers are useful even for companies with networks, because they show the ideal shape and how far the current one is from it.
A typical study for an FMCG company expanding across India runs like this:
- Map the demand. Where are customers, and how much does each region buy, say North 2.5 lakh units, West 3.5 lakh, South 2.5 lakh, East 1.5 lakh? Look at the future too: design for the demand in five years, not today’s.
- Build scenarios. Low, base and high demand, because a network has to work across a range of futures.
- List candidate sites. Mumbai, Pune, Ahmedabad, Delhi, Hyderabad, Bengaluru, Kolkata, Chennai, filtered by land, labour, roads and rail, power, taxes and incentives.
- Collect costs. Fixed cost per site, handling cost, freight rates per lane, inventory carrying cost, and service targets such as delivery within 48 hours.
- Optimize. A mixed-integer model chooses which candidates to open and how product flows, at minimum total cost within service limits.
- Stress-test. Rerun with fuel prices up, a site closed or demand shifted. The best design stays good across scenarios, not just the base case.
The output isn’t just a map. It is a recommended network with the cost, service and risk of each alternative, which is what leadership needs to commit years of investment.
Words to use
- Greenfield vs brownfield
- Designing from scratch versus redesigning an existing network.
- Candidate site
- A feasible location the optimization model may choose to open.
- Sensitivity analysis
- Testing how the recommended design changes when key inputs change.
A toy model with real structure
The FMCG example from the gist: annual demand of 10 lakh units, split North 2.5 lakh, West 3.5 lakh, South 2.5 lakh and East 1.5 lakh. One plant near Pune. Candidate warehouses in Delhi, Mumbai, Bengaluru and Kolkata, with approximate road distances between them.
Assumptions:
- Outbound: ₹3 a unit for local delivery plus ₹0.01 per unit per km from the warehouse.
- Inbound from the plant: ₹0.004 per unit per km (full truckloads are cheaper).
- Fixed cost: ₹1.2 crore a year per warehouse.
- Inventory: ₹0.8 crore × for warehouses.
Every combination was evaluated; the table shows the cheapest for each count, with costs in ₹ crore a year.
| Warehouses | Best sites | Outbound | Inbound | Fixed | Inventory | Total | Demand within 1,000 km |
|---|---|---|---|---|---|---|---|
| 1 | Mumbai | 1.19 | 0.06 | 1.20 | 0.80 | 3.25 | 60% |
| 2 | Delhi, Mumbai | 0.77 | 0.27 | 2.40 | 1.13 | 4.57 | 85% |
| 3 | Delhi, Mumbai, Kolkata | 0.55 | 0.29 | 3.60 | 1.39 | 5.83 | 100% |
| 4 | All four | 0.30 | 0.36 | 4.80 | 1.60 | 7.06 | 100% |
On cost alone, one warehouse in Mumbai wins. But only 60% of demand is within 1,000 km. If the business promises fast delivery to at least 85% of demand, the answer becomes Delhi plus Mumbai, for ₹1.32 crore more a year; covering everyone costs ₹2.58 crore more.
That is the real output of a greenfield study: not one answer, but the price of each level of service, so leadership can choose knowingly.
What a full study adds
- Many more candidate sites, demand zones and products.
- Capacity limits and options per site.
- Freight rates by lane and shipment size, and transit times instead of distances.
- Several demand scenarios, with the design evaluated across all of them.
Robust designs, not just optimal ones
The design that wins the base case may lose badly if demand shifts or costs rise. Common ways to choose under uncertainty:
- Expected cost: weight each scenario by its probability and pick the lowest average.
- Minimax regret: for each design, find its worst shortfall against the best possible design in any scenario, and pick the design whose worst regret is smallest.
- Stochastic optimization: choose sites now (first stage), and let flows adjust in each scenario (second stage), minimizing expected total cost.
The scenario modelling stop works through a regret table.
What the model doesn’t see
Shortlisting candidate sites and checking the final choice needs on-the-ground factors:
- land availability, title and zoning; flood and earthquake risk,
- labour availability, skills and wage trends,
- road, rail and port access; reliable power,
- state incentives, permits and local regulations,
- proximity to key customers and to suppliers’ sites.
Many studies score these factors with weights and combine the scores with the model’s cost results.
From ideal to real
Most companies aren’t truly greenfield, so the ideal design becomes a target, and the real work is the path to it:
- Phasing: which sites to open, close or resize first, often timed with lease expiries.
- Transition costs: dual running, severance, moving stock and equipment, temporary service dips.
- Quick wins: sometimes changing flows (which warehouse serves which zone) captures much of the saving without any new site.
Data pitfalls
- Demand by bill-to address (where invoices go) instead of ship-to address (where goods go) puts demand in the wrong places.
- Freight rates from contracts can differ from what is actually paid; use invoice data where possible.
- Growth assumptions by region matter more than any detail of the base year.
Interview kit
Practise it out loud
Answer each question yourself before opening the model answer.
A greenfield study designs the network from scratch. I’d map current and future demand, build low, base and high scenarios, shortlist candidate sites using hard filters like land, labour, infrastructure and incentives, gather fixed, handling, freight and inventory costs, then run a MILP to pick sites and flows. Finally I’d stress-test the result against scenarios and disruptions, and compare it with the current network to plan the transition.
What is the difference between greenfield and brownfield design?
Greenfield assumes no existing facilities and finds the ideal network. Brownfield starts from current sites, contracts and investments and decides what to keep, close, relocate or add, so switching costs and timing matter. Companies often run both: greenfield to see the ideal, brownfield to plan realistic steps towards it.
Why design for scenarios rather than a single forecast?
Because the network lasts for years and demand will differ from any single forecast. A design that’s optimal only in the base case can be badly undersized or wasteful in other futures. Testing across scenarios finds designs that are good enough everywhere.
Connected stops
Where this idea feeds in, or gets its inputs from.
Sources and further reading
- Chopra, S. & Meindl, P. Supply Chain Management: Strategy, Planning, and Operation. Pearson. Chapter on network design: the four-phase framework.
- Daskin, M. S. (2013). Network and Discrete Location: Models, Algorithms, and Applications (2nd ed.). Wiley.